Monday, July 14, 2014

Hard Work


I went a little crazy this time with nesting. After we had gotten back from our two trips to Canada, I announced to Edmund that we needed a new car (NOW!) and garage shelves, and we needed to finish the basement all before baby 3 comes. Edmund was the best husband ever and said, "Okay, let's do it!" This past month we have done a lot of boring errands to Home Depot, Lowes, and carpet stores. It was exciting. We hired a guy in the ward to do our drywall, taping, and texture. He did a fabulous job, and he was fast! Next, Edmund and I spent a week priming and painting. Then the carpet guys came. While the drywall guy was here Edmund built shelves. Then, after we painted the bedrooms we painted the shelves and put them up. It was a lot of work and the basement bedrooms aren't quite done, but they are good enough! We are ready for you baby.





No comments:

Post a Comment